Support Resources
Onyx PCX Support
All post-column systems manufactured by Pickering Laboratories are fully supported with expert technical service. They are backed by a one year warranty against defects in materials or workmanship. Ion-exchange columns are warranted for 90 days.
Onyx Control Software (Zip file 64MB)
Pickering Laboratories Technical Support
800-654-3330, 650-694-6700, or support@pickeringlabs.com.
Installation and Training
Installation and Training
We encourage you to take advantage of Pickering Laboratories’ individualized two or three-day installation and training courses. For an all-inclusive fee we can provide post-column system installation and training at your site by an experienced chemist from Pickering Laboratories. The training includes performing analyses, routine maintenance and troubleshooting, and chromatogram interpretation.
Some of our authorized distributors offer their own training and installation services. Pickering has trained many local service engineers, and supports them fully on behalf of our distributors and re-sellers.
Whenever you buy installation and training by Pickering Laboratories, please call Technical Support early to schedule our visit to your site. This is especially important if you buy installation through a distributor, because we need to hear all the details directly from you. (Sometimes our distributors forget to tell us vital information like names, telephone numbers and delivery dates.)
Individually-tailored courses are also given at our facility in Mountain View, California. Please telephone or fax with your requirements, and we will advise cost and schedule.
Video Instruction – Operation of the Onyx PCX
Click here to view the instructional video on YouTube.
Click here to download the video as a MPEG-4 file (17MB).
Quick links to Onxy PXC resource material:
Onyx Control Software (Zip file 64MB)
Maintenance
Maintenance
Keep your Onyx PCX in good condition and minimize downtime by performing annual maintenance. Performing Preventative Maintenance on your Onyx PCX is easy to accomplish with the Kits and Instruction we provide. Refer to the Maintenance Section of the Onyx Manual for details on performing the maintenance.
Below you can find a general maintenance schedule. Your maintenance schedule will depend on usage. If you use the Onyx PCX 24×7, you may want to perform the Preventative Maintenance more often.
Maintenance Schedule
Routine Maintenance:
- Check for leaks every day
- Replace Flush and Piston Wash reservoirs every week
- Record operating pressures in a daily log book
Preventative Maintenance:
- Replace Valve and Pump Seals every 12 months
- Replace the 10um Reagent Frits every 3 months
- Change the tubing every 24 months
Video Instruction – Onyx Preventative Maintenance
Click here to view the 33 minute instructional video on YouTube.
Parts Lookup
Parts Lookup
Elite Service Plans
Elite Service Plans
| ||||
Catalog # | Description | Quantity | ||
---|---|---|---|---|
1000-0105 | Onyx Elite Service Plan, 1 year | each | ||
1000-0106 | Onyx Elite Service Plan, 2 year | each | ||
1000-0203 | Onyx Depot Service Plan, 1 year | each | ||
1000-0903 | Onyx Warranty Upgrade | each |